Cost Breakdown & Payment Terms
เฅญเฅซ เคฒเคพเคเคฎเฅ เคเคฐ เคคเคฏเคพเคฐ








Some Design of Houses Costing 75 Lakhs
๐๏ธ Construction Timeline (5 Months)
We are committed to completing your home within 5 months following this systematic work plan:
๐ Month 1: Substructure Works
Completion of foundation work up to the plinth beam level.
๐ Month 2: First Floor and Water Tank
Casting of the first-floor slab.
Construction of the underground water tank.
๐ Month 3: Upper Floors and Sanitary Tanks
Casting of the second and third-floor slabs.
Construction of the septic tank and soak pit.
๐ Month 4: Plaster, Wiring, and Plumbing
Full plastering work.
Completion of electrical wiring and plumbing installations.
๐ Month 5: Final Finishes
Installation of lights, sanitary fixtures, doors, and windows.
Final touches and handover preparation.
๐ก Payment Timeline for Your Dream Home (Rs. 75,00,000)
๐ Step 1: No Advance Payment
๐ After signing the contract, we start construction up to the lower tie beam at our own cost โ no advance needed!
โ๏ธ Step 2: First Installment
Rs. 18,75,000 (25%)
๐น After completing the lower tie beam, we collect the first installment.
๐งฑ Step 3: Second Installment
Rs. 9,37,500 (12.5%)
๐น After finishing the plinth beam construction.
๐๏ธ Step 4: Third Installment
Rs. 9,37,500 (12.5%)
๐น After casting the first roof slab.
๐ Step 5: Fourth Installment
Rs. 9,37,500 (12.5%)
๐น After casting the second roof slab.
๐ข Step 6: Fifth Installment
Rs. 9,37,500 (12.5%)
๐น After casting the third roof slab.
๐งฑโจ Step 7: Sixth Installment
Rs. 9,37,500 (12.5%)
๐น After all brick walls are completed and plastering is finished.
๐ Step 8: Final Installment
Remaining Balance
๐น Pay the final amount after full project handover.
Step-by- Step Construction Animated